top of page

Timed Take Down of a REVOLUTION II

Two Man Take Down, 41 minutes

 This video documented the 2 man removal of a REVOLUTION II that was built 1 year previous.  The bunkerhouse was loaded into the back of a pickup truck for transportation.  The marking of the panels for reassembly is critical due to the different match drilling each panel receives during initial construction.  The rebuilding process takes about double or triple the take down time due to cleaning panel edges, re-leveling floor and caulking.  On rebuild, replace any corroded fasteners, recaulk, and touch up paint.  Enjoy the video.

bottom of page